Green light for the Loser panorama lift
As reported by ORF and the "Kleine Zeitung", the Supreme Cableway Authority granted approval for the new cableway in Styria. Construction work is to start as early as July.
Replacement facility in Chur to improve recreational offerings
The new replacement installation Chur - Fülian - Brambrüesch is assumed to have a transport capacity of 1,400 persons/hour. The existing Chur-Känzeli and Känzeli-Brambrüesch installations will be dismantled in accordance with the law.
Bartholet: Unforgettable fun experiences
With the new bike rack, bicycles can be transported comfortably and quickly. The holder offers a higher transport capacity, flexible positioning options and an elegant design that perfectly matches the modern gondola lift.
Historic project opens in Zermatt
With the opening of the new Matterhorn Glacier Ride II 3S lift, a superlative generation project becomes reality: the Matterhorn Alpine Crossing and thus the first continuous connection between Switzerland and Italy across the Alpine ridge.
Inauen-Schätti: Modernisation in Bannalp
The Fell-Chrüzhütte aerial cableway in Bannalp underwent a complete renewal at the end of 2022. Within two months, the cable car installation was brought up to the latest standard by INAUEN-SCHÄTTI.
Ropeway Project Group: Everything from one supplier
Ropeway Project Group is a network of cable car experts from Austria and South Tyrol. With participation from a broad range of specialist areas, projects can be handled from feasibility study through planning to implementation.